Me10/15/2016 18:50:18
Learning Team Instructions: Wireless Design Project
Not completed (TASK)
Task
Scenario:Your team is hired by a start-up Internet firm to build a hybrid wired/wireless network from the ground up. They are moving into an empty 2-story 2000 square-foot office with no set configuration although they are bringing with them 2 servers a router switches a firewall and 50 clients (Windows 7) 6 printers and 4 scanners. The new office includes a 300 square-foot outside work area. They are asking for your advice on how to build out their offices. Submit the following in Week Five:
A detailed discussion of all design considerations. You will need to include all components including switches router firewall and cabling.
A MicrosoftVisiodiagram of your recommended floor configuration identifying coverage areas. Be sure to include your recommendations for where offices and cubicles would be best situated.
A MicrosoftVisiodiagram of recommended access point locations. Be sure to provide coverage for the outside work area.
Weekly Deliverables:
Week Two: Develop detailed project plan
Week Three: Create logical network design
Week Four: Create physical network design
Week Five: Final Paper and comprehensive network design
Need week four completed on this assignment.