Credit Card Management System

     

    ITEC 630
    Information Systems Analysis, Modeling, and Design
    Individual Project Assignment
    Purpose
    The purpose of the individual system analysis and design project is to demonstrate students ability to
    apply the knowledge learned in this course to a real-world project.
    Topics Suggestions
    1. The system analysis and design project must be realistic and it will be done using techniques covered
    in this course. The list of topics suggested for this project is as follows:
    a) Ticket purchase system (airline, train, cruise, concert, or others)
    b) Internet shopping sites (clothing, shoes, books, music, or others)
    c) Local real estate agency system
    d) Rental system (car, video, or others)
    e) Warehouse management system
    f) Student record system
    g) Banking system
    h) Insurance purchase system (life, medical, homeowner, or others)
    i) Credit card management system
    j) Library circulation system
    2. The above list is meant to be suggestive and if you have an idea about a specific topic, please consult
    with your instructor early to determine if it is suitable for the course.
    3. You have to select and submit the project topic for instructors approval by the end of Week 2.

    Project Deliverables
    The project requires students to perform three phases: (a) requirements analysis, (b) system and database
    design, and (c) a project plan. Note that in the phase 3, students are required to use the MS Project
    software for their project schedule.
    The deadline for the Individual Project can be found in the schedule section of the class syllabus.
    The following layout format covering a title page and all three phases is recommended for the project.
    Title page (project name, author, and date)
    Phase 1: Requirement analysis
    A. Problem definition
    B. Issues
    C. Objectives
    D. Requirements
    E. Constraints
    F. Description of the proposed system
    G. Logical model design
    1. Data flow diagrams
    Context diagram
    Diagram 0
    o Diagram 1 (Diagram 1 is optional)
    Descriptions of processes in each diagram
    2. Descriptions of outputs/inputs/performance/security or controls
    H. Specific requirements, if any (interface, operational, resource, performance, etc.)
    Phase 2: System and database design
    A. User interface
    Design an overall user interface consisting of screens, commands, controls, and features to
    enable users to use the system.
    1. How data will be input to the system?
    The physical layout for each input
    The input design and procedures
    2. How data will be output from the system?
    The physical layout for each output
    The output design and procedures

    B. Data design
    Develop a plan for data organization, storage, updating, and retrieval.
    1. Database design
    Database tables with their attributes should be presented
    Primary key(s) should be identified in each table, if any
    Three steps of normalization should be included.
    2. Entity-relationship diagrams
    3. Data file storage and access
    C. System architecture
    Determine the architecture of the system as Web-based interface, client/server architecture,
    Internet/Intranet interface, network configuration, etc.
    Phase 3: Project plan
    A list of tasks or activities needed for implementing the proposed system
    Estimating completion time and costs
    A project schedule for performing those activities (Gantt charts or PERT charts)
    Note that there is no other required software package except the MS Project software in this ITEC-630
    course. As a result, you are only required to use the MS Project software to handle the scheduling part of
    the project and for other parts, you can use any word editing software or any drawing tools software.

                                                                                                                                      Order Now